Skip to content

1z0-062 Oracle Database 12c: Installation and Administration Practice Questions

Prepare for 1z0-062 with more than an answer.

396 questions in the full set20 sample questionsUpdated Sep 16, 2021
Exam fee
$300 USD
Level
Associate
Valid for
Lifetime (until recertification required)
Domains covered on the exam 20
  1. Exploring the Oracle Database Architecture5%
  2. Oracle Database Management Tools3%
  3. Oracle Database Instance8%
  4. Configuring the Oracle Network Environment7%
  5. Administering User Security10%
  6. Managing Database Storage Structures12%
  7. Managing Undo Data8%
  8. Managing Data Concurrency6%
  9. Implementing Oracle Database Auditing5%
  10. Backup and Recovery Concepts5%
  11. Backup and Recovery Configuration6%
  12. Performing Database Backups10%
  13. Performing Database Recovery10%
  14. Moving Data8%
  15. Performing Database Maintenance4%
  16. Managing Performance: SQL Tuning5%
  17. Managing Resources with Resource Manager4%
  18. Automating Tasks with Oracle Scheduler6%
  19. Installing and Creating Oracle Database8%
  20. Upgrading Oracle Database5%
  1. 1

    Examine the structure of the SALES table, which is stored in a locally managed tablespace with Automatic Segment Space Management (ASSM) enabled.

    You want to perform online segment shrink to reclaim fragmented free space below the high water mark.

    What should you ensure before the start of the operation?

    Question exhibit
    Show answer details

    Correct answer: A

    A

  2. 2

    Which task would you recommend before using the Database Upgrade Assistant (DBUA) to upgrade a single-instance Oracle 11g R2 database to Oracle Database 12c?

    Show answer details
  3. 3

    Your database is open and the listener LISTENER is up. You issue the command:

    LSNRCTL > RELOAD

    What is the effect of RELOAD on sessions that were originally established by LISTENER?

    Show answer details

    Correct answer: C

    C

  4. 4

    Which statement is true regarding the startup of a database instance?

    Show answer details
  5. 5

    Examine the memory-related parameters set in the SPFILE of an Oracle database below.

    Which statement is true?

    Question exhibit
    Show answer details

    Correct answer: B

    B

  6. 6

    Examine the parameters for your database instance below.

    You execute the following command:

    SQL> ALTER TABLESPACE undotbs1 RETENTION NOGUARANTEE;

    Which statement is true in this scenario?

    Question exhibit
    Show answer details

    Correct answer: D

    D

  7. 7

    A user establishes a connection to a database instance by using an Oracle Net connection. You want to ensure the following:

    1. The user account must be locked after five unsuccessful login attempts.
    2. Data read per session must be limited for the user.
    3. The user cannot have more than three simultaneous sessions.
    4. The user must have a maximum of 10 minutes session idle time before being logged off automatically.

    How would you accomplish this?

    Show answer details

    Correct answer: D

    D

  8. 8

    As a user of the ORCL database, you establish a database link to the remote HQ database such that all users in the ORCL database may access tables only from the SCOTT schema in the HQ database. SCOTT’s password is TIGER. The service mane “HQ' is used to connect to the remote HQ database.

    Which command would you execute to create the database link?

    Show answer details

    Correct answer: C

    C

  9. 9

    What happens if a maintenance window closes before a job that collects optimizer statistics completes?

    Show answer details

    Correct answer: D

    Explanation: The stop_on_window_close attribute controls whether the GATHER_STATS_JOB continues when the maintenance window closes. The default setting for the stop_on_window_close attribute is TRUE, causing Scheduler to terminate GATHER_STATS_JOB when the maintenance window closes. The remaining objects are then processed in the next maintenance window. -- Reference: https://docs.oracle.com/cd/B19306_01/server.102/b14211/stats.htm#g49431

  10. 10

    You plan to create a database by using the Database Configuration Assistant (DBCA), with the following specifications:

    • Applications will connect to the database via a middle tier.
    • The number of concurrent user connections will be high.
    • The database will have mixed workload, with the execution of complex BI queries scheduled at night.

    Which DBCA option must you choose to create the database?

    Show answer details

    Correct answer: C

Create an account to continue.