Skip to content

C-TS410-2022 SAP Practice Questions

Prepare for C-TS410-2022 with more than an answer.

208 questions in the full set20 sample questionsUpdated Aug 11, 2025
Exam fee
$1308 USD
Level
Associate
Valid for
12 months
Domains covered on the exam 10
  1. SAP S/4HANA Basics15%
  2. Lead to Cash Processing15%
  3. Source to Pay Processing8%
  4. Design to Operate Processing15%
  5. Recruit to Retire Processing8%
  6. Core Finance: Financial Accounting (FI)15%
  7. Core Finance: Management Accounting (CO)15%
  8. SAP Project Systems (PS)8%
  9. Warehouse and Inventory Management8%
  10. SAP Enterprise Asset Management (EAM)8%
  1. 1

    What is the primary function of the Material Ledger in SAP S/4HANA?

    Show answer details

    Correct answer: B

    The Material Ledger is mandatory in S/4HANA. Its core functions are to carry inventory values in up to three currencies (parallel valuation) and to enable optional actual costing. Actual costing collects all price variances during a period and uses them to calculate a periodic unit price (actual cost) for materials, which can then be used to revalue ending inventory and consumption.

  2. 2

    During the sales order creation process, the system performs an availability check (ATP) and determines that there is insufficient stock to fulfill the customer's requested delivery date. Which of the following is a standard system response in this scenario?

    Show answer details

    Correct answer: C

    The Availability to Promise (ATP) check considers not just current stock but also future planned receipts (like production orders, purchase orders) and planned issues (like other sales orders). If the requested quantity is not available on the requested date, the system will propose new delivery schedule lines based on when the stock is expected to become available. The user can then choose to accept the proposed schedule.

  3. 3

    Case Study:

    Global Fabrications Inc. (GFI) is implementing SAP S/4HANA to manage its complex manufacturing and project-based business. GFI manufactures large industrial machinery (make-to-order) and also undertakes large-scale engineering projects for its clients, which involve procuring materials, hiring external services, and managing internal labor over several months.

    The finance department requires that costs for the long-term engineering projects be collected separately and capitalized as assets upon completion. The manufacturing division needs to track the costs of each machine produced and compare them against standard costs to analyze production efficiency. Both divisions will procure some of the same raw materials.

    The project team has proposed a solution where engineering projects are managed using the Project Systems (PS) module, with costs settling to an Asset under Construction (AuC). The manufacturing of machinery will be managed using Production Orders in the Design-to-Operate process. The CIO is concerned about how costs will be segregated and correctly accounted for in this integrated environment.

    How can GFI ensure that costs for project-specific materials are correctly assigned to the engineering project and NOT to general inventory or manufacturing overhead?

    Show answer details

    Correct answer: C

    This is the correct approach for procuring materials directly for a project. When a purchase order is created with account assignment 'Q', the system requires a WBS element. Upon goods receipt, the material is received into special 'project stock' which is valuated but tied directly to the WBS element. It is not part of general unrestricted-use stock and cannot be consumed by a production order without a specific transfer posting. This ensures strict cost segregation and tracking for the project.

  4. 4

    A user is attempting to post a vendor invoice in Financial Accounting. The system issues an error message stating 'Posting period XXXX is not open'. Which configuration element directly controls whether a posting period is open or closed for a specific company code and account type?

    Show answer details

    Correct answer: B

    The Posting Period Variant is the key configuration object for managing open and closed periods. It is created independently and then assigned to one or more company codes. Within the variant's settings (transaction OB52), administrators can specify which periods are open for posting for different account types (e.g., A for Assets, D for Customers, K for Vendors, M for Materials, S for G/L Accounts). This allows for granular control over the financial closing process.

  5. 5

    Which SAP Fiori design principle ensures that users are presented with only the information and functions that are relevant to their specific role and tasks?

    Show answer details

    Correct answer: C

    The Role-Based principle is fundamental to the SAP Fiori user experience. It dictates that the Fiori Launchpad should be tailored to the user's specific role (e.g., maintenance planner, accounts payable clerk, sales manager). This ensures that users see only the apps, tasks, and data they need to perform their job, reducing complexity and improving efficiency.

  6. 6

    In the Design-to-Operate process, a production supervisor confirms the completion of a production order operation. This confirmation includes the actual labor hours spent. What is the direct impact of this labor confirmation in Management Accounting (CO)?

    Show answer details

    Correct answer: B

    When labor hours are confirmed, the system uses the Activity Type (e.g., 'Labor Hours') defined in the work center and routing. It multiplies the confirmed hours by the activity price maintained for the cost center. This calculated cost is then posted as a debit (actual cost) to the production order and a credit to the cost center that provided the labor. This process is known as activity allocation.

  7. 7

    True or False: In SAP S/4HANA, it is mandatory for a Company Code and its assigned Controlling Area to have the same currency.

    Show answer details

    Correct answer: B

    This statement is false. While it is common for them to share a currency, it is not mandatory. If a company code with a different currency (e.g., EUR) is assigned to a controlling area with another currency (e.g., USD), all postings are converted to the controlling area currency at the time of the transaction. This allows for unified management reporting in a single currency across multinational entities.

  8. 8

    A manufacturing company uses SAP S/4HANA for its Design-to-Operate process. After a production order is confirmed, a goods receipt for the finished product is posted. Which two of the following master data elements are essential for the system to automatically determine the correct G/L accounts for this posting? (Select TWO)

    Show answer details

    Correct answer: B, D

    Automatic account determination for material movements is a key integration point between MM, PP, and FI. The system uses a combination of factors to find the correct G/L accounts in the OBYC configuration. The Valuation Class from the material master groups materials for account determination, and the Valuation Grouping Code allows different plants to be grouped for the same account determination rules, simplifying configuration.

  9. 9

    A project manager is reviewing the costs for a capital investment project managed in SAP Project Systems (PS). They notice that labor costs confirmed against a network activity have not been settled to the final asset under construction (AuC). What is the most likely configuration issue preventing the settlement?

    Show answer details

    Correct answer: B

    The settlement process in PS relies on a settlement profile, which contains an allocation structure. The allocation structure maps source cost elements (like labor costs) to settlement cost elements and receivers. If the specific labor cost element is not included in any source assignment within the allocation structure, the settlement run will ignore these costs, and they will not be transferred to the AuC.

  10. 10

    In SAP S/4HANA, the Universal Journal (ACDOCA) is the single source of truth for financial data. A cost allocation is run in Management Accounting (CO) to distribute utility costs from an administrative cost center to several production cost centers. How is this transaction reflected in the Universal Journal?

    Show answer details

    Correct answer: C

    In SAP S/4HANA, all controlling postings, including internal allocations, generate corresponding line items in the Universal Journal (ACDOCA). An allocation creates a credit posting on the sending cost center and debit postings on the receiving cost centers. These postings use a secondary cost element (G/L account with type 'Secondary Costs') to track the internal cost flow without affecting the company's external financial statements.

Create an account to continue.