1Z0-1066-25 Oracle Planning and Collaboration Practice Questions
Prepare for 1Z0-1066-25 with more than an answer.
- Exam fee
- $245 USD
- Time limit
- 90 minutes
- Questions on the exam
- 50
- Passing score
- 68% (scale 0-100%)
- Level
- Professional
- Valid for
- Varies per Cloud Recertification policy
Domains covered on the exam 6
- Preparing and Defining Input Parameters20%
- Implementing Demand Management20%
- Implementing Supply Planning25%
- Implementing Sales and Operations Planning15%
- Implementing Supply Chain Collaboration12%
- Using AI/ML/Mobile and Other Automation Features8%
- 1
A manufacturing company uses contract manufacturers (CMs) for final assembly. The company needs to provide its CMs with visibility into component delivery schedules and receive timely updates on production progress and potential delays. Which Oracle Cloud module is specifically designed to facilitate this type of collaboration?
Show answer details
Correct answer: B
Oracle Supply Chain Collaboration Cloud provides a portal for trading partners, including suppliers and contract manufacturers. It enables the secure sharing of information like forecasts, commitments, inventory levels, and production updates. This module specifically supports processes for monitoring contract manufacturing, including managing production reports and reviewing orders in jeopardy.
- 2
True or False: The 'Selected Data Refresh' option for running a supply plan will always be faster than a 'Full Data Refresh' and is the recommended default for daily planning cycles.
Show answer details
Correct answer: B
This statement is false. While a 'Selected Data Refresh' (or net change) is often faster as it only brings in changed data, it is not always the case. For example, if a large percentage of data has changed, it can sometimes be less performant than a full refresh. Furthermore, a 'Full Data Refresh' is typically recommended on a regular basis (e.g., weekly) to ensure data integrity and prevent drift, while selected refreshes are used for more frequent, incremental updates.
- 3
A retail company wants to set different inventory policies for items based on their sales velocity and value (e.g., an ABC classification). For example, 'A' items should have a high service level, while 'C' items can have a lower one. Which Oracle Planning Cloud feature allows planners to systematically apply these differentiated policies?
quadrantChart title Inventory Policy Matrix x-axis Low Value --> High Value y-axis Low Velocity --> High Velocity quadrant-1 High Service Level (A Items) quadrant-2 Medium Service Level (B Items) quadrant-3 Low Service Level (C Items) quadrant-4 Review/Phase Out Top Seller: [0.8, 0.9] Standard Item: [0.5, 0.5] Slow Mover: [0.2, 0.1]Show answer details
Correct answer: B
Demand Segmentation is the feature designed to classify products, customers, or locations into groups based on various attributes (like sales volume, revenue, or volatility). Once these segments are defined (e.g., A, B, C items), planners can assign segment-specific planning policies, such as different safety stock service levels, forecasting methods, or fulfillment strategies. This enables a more targeted and efficient planning process.
- 4
During the setup of a demand plan, an administrator needs to ensure that forecast data entered in units can also be viewed in its equivalent monetary value. Which TWO configurations are required to enable this functionality? (Select TWO)
Show answer details
Correct answer: A, B
The plan needs a measure containing the price (e.g., average selling price or standard cost) for each item. This price is then used in calculations to convert units to currency.
A calculated measure must be created with a formula like
Forecast_Value = Forecast_Units * Price. This new measure will display the monetary value of the forecast. - 5
What is the primary function of a planning cycle within the Oracle S&OP Cloud module?
Show answer details
Correct answer: C
A planning cycle is essentially a workflow management tool for the S&OP process. It defines the phases (e.g., Demand Review, Supply Review, Executive Review), the tasks within each phase, the responsible parties, and the deadlines. This ensures the S&OP process is structured, repeatable, and collaborative.
- 6
A global electronics manufacturer is implementing constrained supply planning for a key component sourced from two suppliers with different costs and lead times. Supplier A is cheaper but has a limited monthly capacity defined in the system. Supplier B is more expensive but has unlimited capacity. The business requires the plan to prioritize the cheaper supplier up to its capacity limit before sourcing from the more expensive one. How should an implementation consultant configure the sourcing rules and plan options to achieve this cost-optimized, capacity-constrained sourcing strategy?
Show answer details
Correct answer: D
In a constrained supply plan, the planning engine respects both sourcing ranks and supplier capacity constraints. By ranking the cheaper supplier (A) as 1 and defining its capacity, the engine will allocate demand to it until the capacity is fully consumed. Only then will it move to the rank 2 supplier (B) for the remaining demand. This is the standard method to model capacity-based overflow sourcing.
- 7
A consultant is setting up the data collection process for a new Planning Central implementation. The client wants to ensure that both historical sales data for forecasting and current on-hand inventory levels are accurately reflected in the planning data repository. Which TWO collection entities must be enabled and successfully run to gather booking history and current on-hand balances? (Select TWO)
Show answer details
Correct answer: B, E
The 'Order Orchestration Data' entity is responsible for collecting historical transaction data, such as shipments and bookings, which are essential inputs for generating statistical forecasts in Demand Management.
'On Hand Quantity' collects a snapshot of the current inventory levels from the source system. This is a fundamental input for any supply plan to understand the starting inventory position.
- 8
A demand planner for a consumer goods company is analyzing a forecast for a new product. The forecast was generated using a robust statistical method, but it appears to be significantly over-forecasting due to a one-time promotional event in the historical data that caused an unusual sales spike. The planner needs to adjust the forecast to a more realistic level without permanently altering the historical data or changing the underlying statistical model for future periods. What is the most effective way for the planner to correct the demand plan to account for this non-recurring promotional uplift?
flowchart TD A[Start: Analyze Forecast] --> B{Is there a one-time event skewing data?}; B -->|Yes| C[Apply Manual Override to Final Forecast]; B -->|No| D[Approve Forecast]; C --> E{Is the event recurring?}; E -->|Yes| F[Consider creating a Causal Factor for future use]; E -->|No| G[Document the override reason]; F --> G; G --> D;Show answer details
Correct answer: B
For a one-time, non-recurring event, the most direct and standard practice is for a planner to use their judgment and apply a manual override to the calculated forecast. This corrects the plan without changing the statistical model that works well for normal periods and without altering the integrity of the historical data. Creating a causal factor is more appropriate for recurring events like seasonal promotions.
- 9
A large pharmaceutical company is implementing Oracle S&OP Cloud to bridge the gap between its strategic financial goals and operational plans. Currently, the finance department develops an annual budget in an external system, while the sales team creates an unconstrained demand forecast in Oracle Demand Management. This disconnect frequently leads to supply chain challenges. The primary objective is to create a unified S&OP process where executives can compare three key scenarios within a single view each cycle: 1) the unconstrained demand plan, 2) the official financial budget, and 3) a supply-constrained plan from Oracle Supply Planning. Which sequence of actions represents the most effective and standard approach to configure the S&OP plan to meet these requirements?
Show answer details
Correct answer: B
This is the most robust and standard approach. Using a single S&OP plan with distinct measures allows for direct comparison within the same plan view (table, graph). The 'Import measures from other plans' feature is designed specifically for this purpose, integrating operational plans into the S&OP layer. Using FBDI is the correct method for loading external data like a financial budget. This approach provides a fully integrated environment for executive review and decision-making.
- 10
True or False: In Oracle Supply Chain Collaboration, a supplier can only commit to the exact quantity and date requested by the buyer; they cannot propose changes or splits to the order line.
Show answer details
Correct answer: B
This statement is false. The collaboration platform is designed for two-way communication. Suppliers can accept, reject, or propose changes to quantities and dates. They can also split a single order line into multiple shipments with different dates, providing more realistic commitment information to the buyer's planning engine.
