Skip to content

LEED-GA Leed Green Associate Practice Questions

Prepare for LEED-GA with more than an answer.

234 questions in the full set20 sample questionsUpdated Aug 11, 2025
Exam fee
$250 USD
Level
Associate
Valid for
2 years
Domains covered on the exam 9
  1. LEED Process16%
  2. Integrative Strategies8%
  3. Location and Transportation7%
  4. Sustainable Sites7%
  5. Water Efficiency9%
  6. Energy and Atmosphere10%
  7. Materials and Resources9%
  8. Indoor Environmental Quality8%
  9. Project Surroundings and Public Outreach11%
  1. 1

    The commissioning authority (CxA) for a new 75,000 sq. ft. building discovers during a site visit that the mechanical contractor has installed a different model of chiller than what was specified in the Basis of Design (BOD). The installed chiller is less efficient. What is the CxA's primary responsibility in this situation?

    Show answer details

    Correct answer: B

    The role of the Commissioning Authority (CxA) is to verify and document that systems are designed, installed, and operating according to the Owner's Project Requirements (OPR) and Basis of Design (BOD). The CxA does not have the authority to direct the contractor's work or approve changes. Their responsibility is to identify issues, document them in a log, and report them to the owner and design team, who are responsible for deciding on a resolution.

  2. 2

    True or False: To achieve the LEED prerequisite for indoor water use reduction, a project must replace all existing fixtures with new WaterSense labeled fixtures.

    Show answer details

    Correct answer: B

    This statement is false. The prerequisite requires a 20% aggregate reduction in indoor water use from the calculated baseline. While using WaterSense labeled fixtures is a common and effective strategy to meet this, it is not the only way, nor is it required to replace all fixtures. A project could meet the prerequisite through a combination of strategies, including using efficient fixtures that are not WaterSense labeled, installing flushometer valves on existing toilets, or other measures, as long as the overall 20% reduction is achieved and documented.

  3. 3

    A project team is developing a site plan for a new community library. To encourage community use and provide ecological benefits, they want to maximize the amount of vegetated open space. Which of the following design elements would qualify as vegetated open space for the purposes of the Sustainable Sites credit?

    Show answer details

    Correct answer: C

    Vegetated open space is defined as outdoor space that supports vegetation and is free of hardscapes, buildings, or artificial turf. A walking trail through a preserved woodland area qualifies because the primary area is vegetated and provides ecological value. Artificial turf is explicitly excluded. A paved plaza is hardscape, and while planters add greenery, the space itself is not vegetated. A green roof is a valuable strategy for other credits (like heat island reduction) but is not typically counted in the same way as at-grade open space for this specific credit.

  4. 4

    A project team is trying to achieve the maximum number of points in the Innovation (IN) category. They have a LEED AP on the team, have identified two viable Pilot Credits, and have achieved exemplary performance in one credit category. What else must they do to earn all 5 possible points?

    Show answer details

    Correct answer: B

    The Innovation category allows a maximum of 5 points. These points can be earned through four paths: LEED AP (1 pt max), Pilot Credits (4 pts max), Innovation strategies (4 pts max), and Exemplary Performance (2 pts max). The team currently has: 1 pt for LEED AP + 2 pts for Pilot Credits + 1 pt for Exemplary Performance = 4 points. To get the fifth and final point, they must pursue a qualifying Innovation strategy, which is a separate path from the other three. Achieving more exemplary performance or pilot credits would not help, as they are already earning points in those paths and need to diversify to reach the maximum.

  5. 5

    A project team is in the early stages of designing a mixed-use building in a hot, sunny climate. They are exploring how different systems can influence each other to achieve greater overall performance. Which of the following diagrams best illustrates a key synergy the integrative process aims to uncover?

    graph TD subgraph "Traditional Design" A1[Standard Envelope] --> B1{High Cooling Load}; B1 --> C1[Large, Expensive HVAC]; end subgraph "Integrative Design" A2[High-Performance Envelope & Shading] --> B2{Low Cooling Load}; B2 --> C2[Smaller, Cheaper HVAC]; end style C1 fill:#f99,stroke:#333,stroke-width:2px style C2 fill:#9f9,stroke:#333,stroke-width:2px

    Show answer details

    Correct answer: B

    The core of the integrative process is identifying synergies where one green strategy positively impacts another, often leading to first-cost savings. As illustrated in the diagram, investing in a high-performance building envelope reduces the cooling load. This directly allows the team to specify a smaller, less expensive HVAC system. This 'cascading benefits' effect, where an investment in one area reduces costs in another, is a prime example of systems thinking.

  6. 6

    A project team is developing a 150,000 sq. ft. corporate headquarters on a suburban campus. The owner wants to achieve exemplary performance for outdoor water use reduction. The baseline landscape water requirement (LWR) calculated using the EPA WaterSense Water Budget Tool is 2,500,000 gallons per year. Which of the following landscape designs would achieve the owner's goal?

    Show answer details

    Correct answer: C

    Exemplary performance for Outdoor Water Use Reduction requires a 100% reduction from the baseline. A xeriscape design that requires no permanent irrigation achieves this 100% reduction. Option A represents a 50% reduction (1,250,000 / 2,500,000), which would earn the base credit but not exemplary performance. Option B represents a 30% reduction, meeting only the prerequisite. Option D represents a 70% reduction, which is excellent but does not meet the 100% threshold for exemplary performance.

  7. 7

    During a pre-design charrette for a new hospital, the project team discusses the integrative process. The mechanical engineer suggests that analyzing the building's orientation and massing early on can have significant downstream effects. Which of the following outcomes are direct results of optimizing a building's orientation and massing in the integrative process? (Select THREE)

    Show answer details

    Correct answer: A, C, D

    The integrative process emphasizes early analysis of interconnected systems. Optimizing orientation and massing directly impacts solar heat gain and daylight access. This reduces peak heating/cooling loads (C), which in turn allows for a smaller, more efficient HVAC system (A), a concept known as right-sizing. It also maximizes the potential for passive strategies like daylighting (B). Sourcing of local materials (D) is a separate consideration related to the Materials and Resources category and is not a direct result of orientation and massing decisions.

  8. 8

    True or False: A project can earn the maximum of 4 Regional Priority points by achieving any four of the six available Regional Priority credits identified for its location.

    Show answer details

    Correct answer: A

    This statement is true. Regional Priority credits are bonus points. For any given project location, USGBC designates six existing LEED credits as being of special importance. If a project earns one of these designated credits, it automatically receives one bonus point in the Regional Priority category, up to a maximum of four bonus points.

  9. 9

    A project team is evaluating flooring options for a school in Atlanta, GA. They are considering a bamboo product that is harvested and manufactured in China and shipped to the project site. Which LEED sustainable material attributes would this product contribute to?

    Show answer details

    Correct answer: B

    Bamboo is a type of grass with a harvest cycle of less than 10 years, so it qualifies as a rapidly renewable material. However, since it is harvested and manufactured in China, it does not meet the requirement for Regional Materials, which must be extracted and manufactured within a 500-mile radius of the project site in Atlanta. FSC certification is for wood products from responsibly managed forests and is a separate attribute not mentioned in the product description.

  10. 10

    A new office building project includes a large, exposed aggregate concrete plaza that constitutes 60% of the site's non-roof hardscape. The initial concrete mix has a Solar Reflectance Index (SRI) of 15. The project is located in a dense urban area and needs to mitigate the heat island effect. What is the most effective strategy to meet the requirements for Heat Island Reduction for this plaza?

    Show answer details

    Correct answer: B

    To mitigate the heat island effect for non-roof hardscapes, LEED requires materials to have a minimum SRI of 29. The most direct and effective strategy is to change the material specification itself to meet this requirement. Using white cement and lighter aggregates directly increases the SRI value. A dark sealant would lower the SRI. Shading can be a valid strategy, but shading only 50% may not be sufficient depending on the rest of the site, and changing the material is a more direct approach. Open grid pavers are another valid strategy but would require a complete redesign of the plaza, making it less practical than adjusting the concrete mix.