C2010-555 Maximo Asset Management v7.6 Functional Analyst Practice Questions
Prepare for C2010-555 with more than an answer.
- Exam fee
- $200 USD
- Level
- Deployment Professional
- Valid for
- Certification does not expire (for those who earned it before retirement)
Domains covered on the exam 8
- Asset Management18%
- Predictive and Preventive Maintenance10%
- Work Management and Planning21%
- Procurement Management10%
- Inventory Management15%
- Workflow and Escalations8%
- Analytics and Reporting8%
- Administration and Configuration10%
- 1
A company needs to add the unit of measures for items, tool and services.
In which application can this be done?
Show answer details
Correct answer: A
- 2
After a job plan has been applied to a work order the user finds that 2 more tasks are required to perform the work on the work order.
How does the user add those 2 tasks?
Show answer details
Correct answer: B
Reference: https://www.ibm.eom/support/knowledgecenter/SSLKT6 7.6.0.9/com.ibm.mbs.doc/jobplan/t add tasksJob plans.html
- 3
Where can an end user see in-depth details of a KPI, including its long description, communication logs and configurable historical trending?
Show answer details
Correct answer: C
- 4
The planner identified that the pump required four widgets as material on the work plan. An electrician was issued a quantity of four widgets from the storeroom and was able to complete the work using only two of the four widgets. The two unused widgets were recorded as returned.
How would this be reflected on the Actuals Tab of the Work Order?
Show answer details
Correct answer: D
D
- 5
A user is searching for a classification to add to a record in Work Order Tracking and is unable to find the known existing classification. What could cause this?
Show answer details
Correct answer: D
D
- 6
A user has entered a material receipt in error and wishes to correct it.
Which action should be performed?Show answer details
Correct answer: A
