  1. 1

    A Belt has determined that the loan application does not need to be reviewed by accounting thereby improving the number of applications a loan processor can handle According to Cost of Poor Quality (COPQ)
    definitions RTY improvement would be considered _________________.

    Show answer details

    Correct answer: B

    B

  2. 2

    One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ________________ most valued outputs.

    Show answer details

    Correct answer: D

    D

  3. 3

    Al bought a digital camera from his local electronics store. When he first used it he found the zoom lens function was inoperative because a gear was installed improperly. For the manufacturer of the camera this would be categorized as what type of cost?

    Show answer details

    Correct answer: A

    A

  4. 4

    One of the 5S approaches to eliminating waste is to minimize work activities that are out of the ordinary thereby requiring unusual decisions and actions to accomplish the correct things. This 5S tool is called ___________________.

    Show answer details

    Correct answer: A

    A

  5. 5

    As we conceive and define a LSS project one of the overriding things we hope to accomplish is to reduce the _________________.

    Show answer details

    Correct answer: D

    D

  6. 6

    Cycle Time, Defects, Scrap Cost and Safety are examples of business metrics or commonly referred to as which of the following?

    Show answer details

    Correct answer: B

    B

  7. 7

    A Response Plan is created as part of the Control Plan to ensure improvements are sustained. The following flowchart represents a typical response plan. According to this model, what is the immediate first step after a process check reveals an out-of-control condition?

    flowchart TD A[Start: Perform Process Check] --> B{Is Process in Control?}; B -- Yes --> A; B -- No --> C[Stop the Process]; C --> D[Implement Corrective Action]; D --> E[Verify Effectiveness]; E --> F{Is Problem Solved?}; F -- Yes --> G[Restart & Monitor Process]; F -- No --> H[Escalate to Supervisor]; G --> A; H --> D;

    Show answer details

    Correct answer: C

    Following the 'No' branch from the 'Is Process in Control?' decision point, the flowchart clearly indicates that the immediate next action is to 'Stop the Process'. This is a common practice to contain the problem and prevent the production of more non-conforming products or services.

  8. 8

    Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?

    Show answer details

    Correct answer: E

    E

  9. 9

    SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.

    Show answer details

    Correct answer: B

    B

  10. 10

    The following Business Case is constructed properly.
    “During most of 2008 Division 16 experienced a 4.2% product return rate versus a target of nearly no returns. This costs the company a whole bunch of money.

    Show answer details

    Correct answer: B

    B