TMPTE TMap NEXT Test Engineer (EX0-113) Practice Questions
Prepare for TMPTE with more than an answer.
- Exam fee
- $250 USD
- Level
- Foundation
- Valid for
- No expiration
Domains covered on the exam 6
- Fundamentals of Testing15%
- TMap Test Process and Life Cycle25%
- Test Design Techniques30%
- Test Management and Strategy15%
- Test Infrastructure and Environment10%
- Quality Characteristics and Defect Management5%
- 1
For the creation of the central starting point there are several techniques. In the given situation it is necessary that consistency between the data entered is guaranteed. Which of the techniques below is preferable if only one technique may be used?
Show answer details
Correct answer: C
C
- 2
What is the definition of valuation? What is the definition of valuation?
Show answer details
Correct answer: C
C
- 3
In which Map phase activity does the pre-test take place?
Show answer details
Correct answer: B
B
- 4
See the illustration below:
What is the minimum number of logical test cases generated by the use of the Process Cycle Test if the coverage type paths test depth level 2 is used?

Show answer details
Correct answer: C
C
- 5
What is not an advantage of applying a test design technique and recording it in the test specifications?
Show answer details
Correct answer: C
C
- 6
Problems can be prevented by looking closely at the way the starting point for the test execution must be structured and which process must be deployed when using it. Which problem does this not prevent?
Show answer details
Correct answer: A
A
